• UMIR Communities
    • UM Main
    • UM Bansalan
    • UM Digos
    • UM Guianga
    • UM Ilang-Tibungco
    • UM Panabo
    • UM Peñaplata
    • UM Tagum
  • Library Catalog
    • UM Main OPAC
    • UM Bansalan OPAC
    • UM Digos OPAC
    • UM Guianga OPAC
    • UM Ilang-Tibungco OPAC
    • UM Panabo OPAC
    • UM Peñapalata OPAC
    • UM Tagum OPAC
  • Login
 
View Item 
  •   UMIR Home
  • UM Main
  • Undergraduate Theses
  • View Item
  •   UMIR Home
  • UM Main
  • Undergraduate Theses
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Assessment of Ma-a creek along Purok Kapundok : basis for diversion and design improvement

Thumbnail
View/Open
Manuscript language material (7.350Mb)
Date
2023-07
Author
Recede, Jason Rex
Alcain, Klea Jane
Cabeza Jr, Alfredo
Metadata
Show full item record
Abstract
Flooding has been a national concern in the Philippines, with high chances to occur during typhoons and may happen in the future due to rapid urban development. Flood risk reduction strategies can be enhanced by a diversion channel, increasing the waterway's capacity, or a closed diversion canal. The assessment of Maa Creek along Purok Kapundok: the basis for diversion or design improvement is a critical study that assesses the current state of the creek and the measures that can be taken to mitigate or reduce the flood discharge, even so, improve the functionality of the vicinity. The study gathered essential data, including the creek's geometry and dimensions, water flow data, and more. Following, HEC-RAS is utilized to simulate and compare the existing channel and the proposed diversion channel. The results of HEC-RAS steady flow modeling found that a diversion shortcut will further increase the water flow, thus, reducing the water elevation. Also, incorporating culverts in the diversion will add to the area's functionality. Simulating the flow that is critical for the creek, gathered hydrological data from the year 2018 is used for the unsteady flow. Here, it is found that water surface elevation reaches up to 3.12 meters high. In addition, results from sediment analysis of the proposed diversion show that invert siltation will increase by 0.95 meters in 1 year. In conclusion, a diversion shortcut with culverts reduces water surface elevation because of improved water discharge. Nevertheless, the design capacity is enough, and the future capacity may be reduced due to the siltation. It is essential to conduct regular monitoring and assessment of sediment build-up to sustain the correct water depth and prevent flooding.
URI
https://repository.umindanao.edu.ph/handle/20.500.14045/1866
Collections
  • Undergraduate Theses

 

 

Browse

All of UMIRCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

LoginRegister